+91-9873379062 | info@oindc.com
LEAN MANUFACTURING • WASTE REDUCTION • PRODUCTIVITY • FLOW

Reduce Waste. Improve Flow. Increase Productivity.

OINDC helps MSMEs identify and eliminate manufacturing waste, improve material and information flow, standardize work, strengthen shopfloor discipline and build a continuous-improvement culture—so Lean becomes visible in daily operations and measurable in business results.

Shopfloor Assessment • Waste Mapping • Flow Improvement • 5S • Kaizen • KPI Improvement
OINDC Lean Manufacturing Shopfloor Review and Material Flow Optimization
Core Philosophy

Creating More Customer Value With Less Waste

Lean Manufacturing is a systematic approach to improving how work flows through an organization by identifying and eliminating activities that consume time, space, movement, material, or capacity without creating value for the customer.

For an MSME, Lean does not mean expensive automation. It starts with practical shopfloor discipline: workplace organization (5S), material flow, standard work, quality at source, setup time reduction, and employee-led Kaizens.

Solving Shopfloor Problems with Lean

Too Much WIP: Improve flow, batching & pull systems.
Long Lead Times: Eliminate waiting & movement waste.
High Rejection: Build quality at source & Poka-Yoke.
Machine Downtime: Deploy basic TPM & PM plans.
Long Changeovers: Apply SMED setup reduction methods.
Firefighting Culture: Establish daily visual management.
Waste Identification

Find the 8 Wastes Hiding in Your Factory

Uncover non-value-added activities draining profitability and capacity.

1. Defects

Rejection, rework, scrap, and customer complaints.

OINDC Focus: Quality at source & CAPA.
2. Overproduction

Producing items before demand or faster than needed.

OINDC Focus: Production planning & pull.
3. Waiting

Operators, machines, or materials waiting for approvals/parts.

OINDC Focus: Flow & bottleneck removal.
4. Non-Utilized Talent

Underutilizing employee skills, ideas, and problem-solving.

OINDC Focus: Employee Kaizen programs.
5. Transportation

Unnecessary movement of WIP, tools, or finished goods.

OINDC Focus: Factory layout optimization.
6. Inventory

Excess raw materials, work-in-process (WIP), or stocks.

OINDC Focus: Replenishment discipline.
7. Motion

Unnecessary walking, reaching, searching, or bending by operators.

OINDC Focus: Ergonomics & 5S setups.
8. Extra-Processing

Redundant inspections, extra steps, or over-specifying work.

OINDC Focus: Process simplification.
Shopfloor Execution

Factory Layout & Material Flow Optimization

Lean improvements fail when physical material movement remains chaotic. OINDC combines Lean tools with practical factory layout redesign to align machine locations, gangways, and workstations directly with production flow.

5S & Visual Controls: Workplace organization, visual boundaries, and gangway marking.
Standardized Work: Defining cycle times, sequence of work, and quality checkpoints.
Kaizen System: Empowering employees to submit and execute small daily improvements.
SMED Setup Reduction: Separating internal/external setups to minimize downtime.

Lean KPI & Performance Tracking

Lead Time: Order placement to dispatch cycle.
WIP Reduction: Eliminating shopfloor inventory accumulation.
OEE Tracking: Equipment availability, speed, & quality.
Scrap & Rework: Direct measurement of quality loss.
On-Time Delivery: Meeting customer delivery schedules.
5S Score: Sustained monthly workplace audit scores.

OINDC Lean Implementation Roadmap

From shopfloor observation to sustained continuous improvement.

01 — 03

Discover, Observe & Measure

Understand product mix, go to the Gemba to observe actual material flow, and establish baseline KPI data for WIP, lead times, and rejection.

04 — 06

Map, Prioritize & Implement

Map the value stream to identify waste, select high-impact projects (5S, line balancing, setup reduction), and execute shopfloor changes.

07 — 09

Verify, Standardize & Sustain

Measure before-versus-after performance, update standard work procedures, and embed daily management boards to sustain improvements.

Shopfloor Assessment Form

Find the Waste Hiding in Your Factory

Tell us about your factory, manufacturing processes, and primary bottleneck. OINDC will assess the current process and recommend a practical Lean improvement roadmap.

Book a Lean Manufacturing Assessment

Lean Manufacturing FAQ

Practical answers for MSME owners and plant managers.

Is Lean Manufacturing only for large companies?

No. Lean is highly practical for MSMEs. Simple improvements in workplace organization (5S), material flow, standard work, and setup times deliver immediate benefits without complex systems.

Will implementing Lean require expensive automation?

Not at all. Lean focuses on eliminating non-value-added waste using existing resources through better flow, layout adjustments, visual controls, and operator discipline.

Can Lean be combined with ZED or ISO systems?

Yes. Lean, 5S, and Kaizen provide the operational improvements and waste reduction needed to excel in ZED assessments and ISO quality management systems.

How do we start a Lean project with OINDC?

Start with a Lean Manufacturing Assessment. OINDC consultants will observe your shopfloor, map your current material flow, identify major waste, and propose a prioritized implementation roadmap.

How Much Waste Is Hiding in Your Factory?

OINDC helps MSMEs move Lean from classroom concepts to measurable shopfloor results.