ZED Bronze Audit Guide

MSME Sustainable (ZED) Bronze Certification Requirements

A practical audit-readiness guide covering all 7 mandatory parameters under the updated ZED scheme. Prepare your shopfloor, implement required SOPs, and pass your onsite assessment.

Download Complete DIY Template Pack (on oindc.in) ↗

The 7 Mandatory Bronze Parameters

Detailed evidence and documentation checklist required for ZED Bronze Certification.

Parameter 01

1. Leadership

Defined operational accountability and periodic review of statutory and regulatory compliance.

  • Organogram / Organisation Chart
  • Job Responsibility Matrix
  • Regulatory Compliance Register (Factory Act, PCB, Fire, Electrical)
  • Management Review Minutes (MOM)
Parameter 02

2. Swachh Workplace

Cleaning, hygiene routines, waste segregation, and a clean, uncluttered workplace.

  • Housekeeping & Cleaning SOP
  • Area Responsibility Matrix
  • Cleaning Schedules & Checklists
  • 5S Shopfloor Photographs
Parameter 03

3. Workplace Safety

Identification of workplace risks, provision and mandatory use of PPE, and safety training.

  • Workplace Safety Policy
  • Risk Assessment / JSA / HIRA Register
  • PPE Matrix & Issue Log
  • Emergency Contacts & Fire Safety Records
Parameter 04

4. Timely Delivery

Systematic recording of delivery commitments and tracking On-Time In-Full (OTIF) dispatches.

  • Dispatch Procedure SOP
  • Sales Order & Delivery Register
  • Monthly OTIF Delivery Calculation
  • Delay Analysis & CAPA Log
Parameter 05

5. Quality Management

Established product quality standards, incoming/final inspection plans, and non-conformance controls.

  • Quality Policy & Product Drawings
  • Quality Control Plan (QCP)
  • Inspection & Test Reports
  • NCR, Rejection & CAPA Register
Parameter 06 (New)

6. Energy Management

Identification of energy sources, consumption monitoring, targets, and employee awareness.

  • Energy Source & Equipment Register
  • Electricity & Fuel Consumption Bills/Logs
  • Monthly Energy Intensity KPI Tracker
  • Energy Conservation SOP & Action Plan
Parameter 07 (New)

7. Measurement & Analysis

Tracking key quality indicators (defects, rework, rejections) and customer feedback for continuous improvement.

  • Monthly Quality Performance Dashboard
  • Customer Feedback & Complaint Log
  • Root Cause Analysis (RCA) Reports
  • Periodic Review Meeting Records

Onsite Physical Audit Readiness

Under updated guidelines, ZED Bronze includes a mandatory physical assessor visit. Ensure your shopfloor is prepared according to this checklist:

Shopfloor Zone What the Assessor Will Inspect Onsite
Factory Entrance Unit name board, clean surroundings, regulatory certificates displayed.
Production Floor Clear walkways (no material blockages), machine guards installed, organized WIP.
Occupational Safety Workers wearing required PPE, unobstructed fire extinguishers, clear emergency exits, first-aid box.
Stores & Warehouse Identified raw material/finished goods racks, status tags (Accepted/Rejected/Pending).
Quality Control Designated inspection area, calibrated instruments, inspection reports.
Energy & Utilities Sub-meters/main electricity panel access, compressed air leak check logs, clean DG area.

Ready to Get ZED Bronze Certified?

Download our complete, pre-formatted DIY Document Package containing all required SOPs, Excel trackers, and checklists on our application portal.

Apply & Download DIY Templates on oindc.in ↗